14 meters high, 98 meters long single frame factory building, static and architectural design of all facades, creation of turnkey specifications and turnkey construction of the work. Due to limited time, the entire project was completed in 5 months. 1180 m2 semi-mechanical stone coating, 75 tons of steel carrier system, 850 m2 aluminum decorative coatings, large size glass coatings, water insulation/roof works and other details.