Dünyanın En İyi Taşlarıyla Mekanları Dönüştürüyoruz
-
30+
Tamamlanan Proje
-
6
Ülkeye İhracat
-
5
Yıllık Deneyim
-
47
Benzersiz Taşlar
Ürünler
Blog Yazıları
Taş Koleksiyonu
Granite
Quartzite
Projects
Akbay Villas
Imported and local natural stone was installed on approximately 2500 square meters of interior/exterior and facades of 3 ultra-luxurious decorated villas. High quality work was delivered. Stone supply, project design and installation were done.
Aksoylar Holding
14 meters high, 98 meters long single frame factory building, static and architectural design of all facades, creation of turnkey specifications and turnkey construction of the work. Due to limited time, the entire project was completed in 5 months.
Dede Law Firm
Within the scope of the renovation, more than 700 m2 of imported natural stone floor wall coverings, countertops and insulation works were completed.
Fimar Holding
In the central holding building; mechanical, semi-mechanical facade cladding, floor and wall cladding, special surface treatments and approximately 6000 square meters of natural stone cladding in interior and exterior spaces have been completed.
İDEAL.İST Dental Clinic
The oral and dental health center with a service area of 250 m2 was built on a turnkey basis, including architectural design and implementation projects, electromechanical and all kinds of rough-fine-decorative applications and licensing.
Kayalar Holding
Within the scope of renovation, 450 m2 imported natural stone supply, architectural design and layout design and implementation, 650 m2 old natural stone cladding maintenance and repair.
Kuzu Holding
The central holding building was covered with 3550 m2 of natural stone, semi-mechanical mortar large-size floor, wall, inverted ceiling and furniture coverings.
Livera Homes 2
Approximately 3000 m2 of interior space, landscaping, building facade (mechanical/semi-mechanical), porcelain ceramics, kitchen - bathroom countertops, local natural stone supply and installation were made.
Ramada Encore Hotel
Hotel lobby and floor halls architectural design, mechanical - semi-mechanical - bonding system natural stone supply and installation. Approximately 1250 m2 of natural stone covering was done.
US Embassy Islamabad
Phase 1, Chief Master Residence and Phase 2; Cmpd, interior and exterior natural stone installations. All installation methods were used in this project. It was completed in 6 years with 50+ Turkish professional stonemasons and 150+ Pakistani assistant team.